Project Scope
To design an enclosure which could house 2 x 500mm diameter sidewall riser pipes for the Landfill industry.
Project Delivery
Working with the contractor at a site in Teesport in 2013, a number of drawbacks were identified with the original concrete bunker design. Cygnet’s technical team developed a proprietary solution which has since been adopted as a standard for the Landfill industry.
Key Elements
  • Avoid the in-situ construction of heavy concrete structures on the perimeter of the engineered clay bunds on new cells
  • Prefabricated HDPE structures are far more effective of protecting these site assets
  • Lightweight, easy to handle and simple to install
Landfill Solutions
Landfill Solutions
Landfill Solutions

Our Case Studies

You may be interested in our other projects

Elentec Water treatment Case Study

ELENTEC

BRINGING A CLIENT PROTOTYPE TO MARKET

Civil Engineering Solutions

ACO TECHNOLOGIES PLC

FROM PRODUCT SOLUTION TO FABRICATION PARTNER

Plastic Fabrications

HYDRO WMS LTD

ENSURING QUICK ACCESS TO BULK AND TECHNICAL PARTS